George Mason University, USA.
World Journal of Advanced Research and Reviews, 2025, 26(02), 2631-2636
Article DOI: 10.30574/wjarr.2025.26.2.1888
Received on 04 April 2025; revised on 14 May 2025; accepted on 16 May 2025
Artificial intelligence revolutionizes construction scheduling by dynamically adjusting timelines based on real-time conditions. Traditional scheduling methods like Critical Path Method and Program Evaluation and Review Technique create static plans ill-suited for construction's inherent volatility, contributing to widespread delays and resource inefficiencies across global projects. This article presents a comprehensive framework for AI-driven construction scheduling that integrates data acquisition, preprocessing, model training, real-time optimization, and feedback mechanisms. The framework leverages multiple machine learning paradigms including supervised learning, unsupervised learning, and reinforcement learning to achieve superior scheduling outcomes. Advanced neural networks process numerous interrelated variables simultaneously, while genetic algorithms optimize resource allocation with documented improvements in equipment utilization and labor efficiency. Hybrid ontology-based approaches formalize construction concepts within computational frameworks, enabling AI schedulers to incorporate domain expertise while maintaining computational flexibility. Implementation considerations encompass both technical aspects like system architecture and organizational factors such as user interface design and incremental deployment strategies. Case studies from diverse construction environments demonstrate significant benefits including reduced project duration, improved resource utilization, and enhanced resilience against disruptions from weather, supply chain issues, and other unpredictable factors. The effectiveness increases with project complexity and demonstrates cumulative improvement over time through continuous learning mechanisms.
Artificial Intelligence; Construction Scheduling; Real-Time Optimization; Machine Learning; Dynamic Adaptation
Preview Article PDF
Sai Manoj Jayakannan. Real-time dynamic scheduling in construction: An Artificial Intelligence approach. World Journal of Advanced Research and Reviews, 2025, 26(2), 2631-2636. Article DOI: https://doi.org/10.30574/wjarr.2025.26.2.1888