World Journal of Advanced Research and Reviews, 2026, 32(02), 768–786
Article DOI: 10.30574/wjarr.2026.32.2.2874
Received on 03 October 2026; revised on 09 November 2026; accepted on 11 November 2026
Zambia’s heavy reliance on hydropower was exposed by the 2023–2024 drought, prompting ZESCO Limited, the national electricity utility, to accelerate renewable energy projects such as Kafue Gorge Lower and the Chisamba solar plants. At the same time, Artificial Intelligence (AI) tools are increasingly promoted as a means of improving project planning, monitoring and control. This study examined the effectiveness of AI in project management with reference to ZESCO’s renewable energy projects, focusing on the types of AI tools used, their effectiveness, their relationship with project completion and the limitations of their use. Guided by a case study design and a mixed-methods approach, data were collected from 100 purposively selected respondents, including project managers, engineers, project team members, ICT officers and contractors, through questionnaires, interviews and document review, and were analyzed using descriptive statistics in STATA and thematic analysis. The findings revealed that AI-assisted scheduling and forecasting (34%) and predictive analytics (27%) were the most used tools, applied mainly in planning and monitoring, and introduced largely through existing software (48%) and contractors (26%). AI was viewed as effective, with 78% reporting improved planning accuracy, 72% rating it effective in monitoring and reporting and 58% reporting faster decision-making. A majority (54%) considered AI-supported projects to progress faster than similar projects without AI, and 85% rated the quality of works as high or very high. However, delays and budget overruns persisted, driven mainly by funding and foreign exchange issues, procurement procedures and exchange rate changes. Limited staff skills (33%), high costs (22%), poor data quality (19%) and the absence of an AI policy (36%) were the main constraints. The study concluded that AI is an effective but conditional enabler of project completion whose benefits depend on skills, data, infrastructure and governance, and recommended an organizational AI policy, staff training, stronger data management, wider use of AI in procurement and financial risk management, and resilient ICT infrastructure.
Artificial Intelligence, Project Management, Renewable Energy, Project Completion, ZESCO, Zambia
Preview Article PDF
Kanekwa Mtonga and Chisala Bwalya. EXAMINING THE EFFECTIVENESS OF ARTIFICIAL INTELLIGENCE IN PROJECT MANAGEMENT: A CASE STUDY OF ZESCO CONSIDERING RENEWABLE ENERGY PROJECTS. World Journal of Advanced Research and Reviews, 2026, 32(02), 768–786. Article DOI: https://doi.org/10.30574/wjarr.2026.32.2.2874