Home
World Journal of Advanced Research and Reviews
International Journal with High Impact Factor for fast publication of Research and Review articles

Main navigation

  • Home
    • Journal Information
    • Editorial Board Members
    • Reviewer Panel
    • Abstracting and Indexing
    • Journal Policies
    • Our CrossMark Policy
    • Publication Ethics
    • Issue in Progress
    • Current Issue
    • Past Issues
    • Instructions for Authors
    • Article processing fee
    • Track Manuscript Status
    • Get Publication Certificate
    • Join Editorial Board
    • Join Reviewer Panel
  • Contact us
  • Downloads

eISSN: 2581-9615 || CODEN: WJARAI || Impact Factor 8.2 ||  CrossRef DOI

Research and review articles are invited for publication in March 2026 (Volume 29, Issue 3) Submit manuscript

An Assessment of the Effects of Bureaucratic bottlenecks on Public Project Delivery

Breadcrumb

  • Home
  • An Assessment of the Effects of Bureaucratic bottlenecks on Public Project Delivery

Oluwatayomi Daniel Fadumo 1, *, Charles Adedoja Adewunmi 2, Oghale Josephine Umolo 3 and Chukwubuikem Emmanuel Osonwa 1

1 Department of Building, Faculty of Environmental Sciences, Nnamdi Azikiwe University Awka -Anambra State.

2 Department of Building, Faculty of Environmental Sciences, Southern Delta University Ozoro-Delta State.

3 Department of Engineering, Mannproject Ltd, Warri – Delta State.

Research Article

World Journal of Advanced Research and Reviews, 2025, 28(03), 908-914

Article DOI: 10.30574/wjarr.2025.28.3.4107

DOI url: https://doi.org/10.30574/wjarr.2025.28.3.4107

Received on 01 November 2025; revised on 10 December 2025; accepted on 13 December 2025

While bureaucracy is critical in maintaining order and ensuring compliance, it has often been criticized for creating inefficiencies in public project delivery. In developing countries like Nigeria, bureaucratic bottlenecks have become a significant hindrance to infrastructure development with issues such as delays due to prolonged approval processes, excessive paperwork, and fragmented coordination among agencies. This study therefore assessed the implications of bureaucratic processes on effective public project delivery with a view to recommending measures to enhance efficient project delivery. Two objectives were developed, and they include : to examine bureaucratic processes involved in public project delivery and to appraise the effects of bureaucratic bottlenecks on public project delivery. Descriptive survey design was adopted, focusing on the Agu Awka–Umuchu 132kV Double Circuit Transmission Line Project and the Anambra International Convention Center. Using Purposive sampling, 282 questionnaires were distributed to government officials, engineers, project contractors, community representatives and stakeholders involved in the projects. Five (5) main aspects of bureaucratic processes in public project delivery. The most significant effects of bureaucratic bottlenecks are Project Delays and Idle Capital(4.50), Cost Overruns (4.33), loss of Public Confidence and Negative Economic Ripple effects (4.13). The study, through interactions with stakeholders, recommends that strategic measures such as e-governance and digital workflow systems, coupled with decentralized decision-making, are critical to enhancing bureaucratic efficiency and project delivery outcomes.

Bureaucracy; Public projects; Project delivery; Construction industry; Completion time

https://wjarr.com/sites/default/files/fulltext_pdf/WJARR-2025-4107.pdf

Preview Article PDF

Oluwatayomi Daniel Fadumo, Charles Adedoja Adewunmi, Oghale Josephine Umolo and Chukwubuikem Emmanuel Osonwa. An Assessment of the Effects of Bureaucratic bottlenecks on Public Project Delivery. World Journal of Advanced Research and Reviews, 2025, 28(3), 908-914. Article DOI: https://doi.org/10.30574/wjarr.2025.28.3.4107

Copyright © Author(s). All rights reserved. This article is published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, sharing, adaptation, distribution, and reproduction in any medium or format, as long as appropriate credit is given to the original author(s) and source, a link to the license is provided, and any changes made are indicated.


All statements, opinions, and data contained in this publication are solely those of the individual author(s) and contributor(s). The journal, editors, reviewers, and publisher disclaim any responsibility or liability for the content, including accuracy, completeness, or any consequences arising from its use.

Get Certificates

Get Publication Certificate

Download LoA

Check Corssref DOI details

Issue details

Issue Cover Page

Editorial Board

Table of content

Copyright © 2026 World Journal of Advanced Research and Reviews - All rights reserved

Developed & Designed by VS Infosolution