Home
World Journal of Advanced Research and Reviews
International Journal with High Impact Factor for fast publication of Research and Review articles

Main navigation

  • Home
    • Journal Information
    • Editorial Board Members
    • Reviewer Panel
    • Abstracting and Indexing
    • Journal Policies
    • Our CrossMark Policy
    • Publication Ethics
    • Issue in Progress
    • Current Issue
    • Past Issues
    • Instructions for Authors
    • Article processing fee
    • Track Manuscript Status
    • Get Publication Certificate
    • Join Editorial Board
    • Join Reviewer Panel
  • Contact us
  • Downloads

eISSN: 2581-9615 || CODEN: WJARAI || Impact Factor 8.2 ||  CrossRef DOI

Research and review articles are invited for publication in March 2026 (Volume 29, Issue 3) Submit manuscript

Optimization of Big Digger Unit Productivity at Gunung Turak Pit by Minimizing Delays in Packmeal Distribution and Enhancing Packmeal Quality at PT AMM MHU Site during the May - August 2025 Period

Breadcrumb

  • Home
  • Optimization of Big Digger Unit Productivity at Gunung Turak Pit by Minimizing Delays in Packmeal Distribution and Enhancing Packmeal Quality at PT AMM MHU Site during the May - August 2025 Period

Agus Amirudin 1, *, Zulkarnaen Zulkarnaen 2, Ikhtiar Dwi Wardhana 3 and Syawal Kamiluddin Saptaputra 4

1 Department of SHE, PT Antareja Mahada Makmur, Site MHU.

2 Operational Manager, PT Antareja Mahada Makmur, Site MHU.

3 Section Head Engineering PT Antareja Mahada Makmur, Site MHU.

4 Occupational Safety and Health Department, Faculty of Public Health, Halu Oleo University.

Research Article

World Journal of Advanced Research and Reviews, 2025, 28(02), 2457-2467

Article DOI: 10.30574/wjarr.2025.28.2.3988

DOI url: https://doi.org/10.30574/wjarr.2025.28.2.3988

Received on 17 March 2025; revised on 26 April 2025; accepted on 29 April 2025

Background: Background: The productivity of the Big Digger unit at the Gunung Turak Pit of PT AMM Site MHU experienced a significant decline in the period January–April 2025, as indicated by a cumulative revenue loss of Rp27,940,329,803.70. Root cause analysis showed that this loss was caused by delays in pack meal distribution that coincided with rest periods and low food quality, triggering dissatisfaction (morale) and operational delays (delivery). Several incidents occurred in the mining industry during direct pack meal distribution.

Objective: This study aims to demonstrate the effectiveness of logistics interventions (delay minimization) and pack meal quality improvements on increasing the productivity of the Big Digger unit and its impact on QCDSM (Quality, Cost, Delivery, Safety, Morale) aspects.

Methodology: This type of research is quantitative descriptive. This activity was carried out from May to August 2025 at PT. AMM Site MHU. This activity consists of several stages, namely conducting cause and effect analysis, determining the root cause, planning corrective actions, implementing improvements, evaluating results, standardizing, and determining the next steps. The sampling technique used was purposive sampling, namely on workers directly involved in the process of providing, transporting, and distributing packmeal, including big digger operators, the Production Team, the HCGA team, and the SHE Team. Data were collected through interviews, observation, and documentation.

Results: Logistics and quality interventions proved highly effective. In the After period, revenue losses were successfully eliminated, and the actual productivity of the Big Digger unit returned to target. This performance improvement was supported by improvements in the Delivery aspect (centralized distribution without disrupting production time) and increased operator morale. Furthermore, improvements to the logistics system eliminated direct contact between officers and units, structurally minimizing the risk of Unsafe Conditions (KTA) and Unsafe Acts (TTA), supporting the S.M.A.R.T (Safety Management and Attitude Reinforcement Techniques) principle.

Conclusion and Recommendation: Packmeal optimization is a fairly holistic management intervention and has successfully stabilized Cost aspects and improved QCDSM. It is recommended that this packmeal intervention model be standardized as a permanent Standard Operating Procedure (SOP) with quality and timeliness monitoring of catering under the direct control of the Production Department, HCGA, and SHE, to ensure sustainable productivity and safety.

Packmeal, Loss Revenue; Productivity; Big Digger; S.M.A.R.T (Safety Management and Attitude Reinforcement Techniques); Delay; QCDSM

https://wjarr.com/sites/default/files/fulltext_pdf/WJARR-2025-3988.pdf

Preview Article PDF

Agus Amirudin, Zulkarnaen Zulkarnaen, Ikhtiar Dwi Wardhana and Syawal Kamiluddin Saptaputra. Optimization of Big Digger Unit Productivity at Gunung Turak Pit by Minimizing Delays in Packmeal Distribution and Enhancing Packmeal Quality at PT AMM MHU Site during the May - August 2025 Period. World Journal of Advanced Research and Reviews, 2025, 28(2), 2457-2467. Article DOI: https://doi.org/10.30574/wjarr.2025.28.2.3988

Copyright © Author(s). All rights reserved. This article is published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, sharing, adaptation, distribution, and reproduction in any medium or format, as long as appropriate credit is given to the original author(s) and source, a link to the license is provided, and any changes made are indicated.


All statements, opinions, and data contained in this publication are solely those of the individual author(s) and contributor(s). The journal, editors, reviewers, and publisher disclaim any responsibility or liability for the content, including accuracy, completeness, or any consequences arising from its use.

Get Certificates

Get Publication Certificate

Download LoA

Check Corssref DOI details

Issue details

Issue Cover Page

Editorial Board

Table of content

Copyright © 2026 World Journal of Advanced Research and Reviews - All rights reserved

Developed & Designed by VS Infosolution