Home
World Journal of Advanced Research and Reviews
International Journal with High Impact Factor for fast publication of Research and Review articles

Main navigation

  • Home
    • Journal Information
    • Editorial Board Members
    • Reviewer Panel
    • Abstracting and Indexing
    • Journal Policies
    • Our CrossMark Policy
    • Publication Ethics
    • Issue in Progress
    • Current Issue
    • Past Issues
    • Instructions for Authors
    • Article processing fee
    • Track Manuscript Status
    • Get Publication Certificate
    • Join Editorial Board
    • Join Reviewer Panel
  • Contact us
  • Downloads

eISSN: 2582-8185 || CODEN: WJARAI || Impact Factor 8.2 ||  CrossRef DOI

Research and review articles are invited for publication in March 2026 (Volume 29, Issue 3) Submit manuscript

Feasibility Study and Sizing of a Photovoltaic Power Plant for Integration into the Kasongo Distribution Grid

Breadcrumb

  • Home
  • Feasibility Study and Sizing of a Photovoltaic Power Plant for Integration into the Kasongo Distribution Grid

ASSANI SAIDI MZEE 1, *, CIMBELA KABONGO Joseph G 2 and TANGENYI OKITO Marcien 3

1 Institut Supérieur de Techniques Appliquées de KINDU, Electricity Department, Democratic Republic of the Congo.

2 Department of Physics and Applied Sciences, Faculty of Science, Pedagogical National University, Kinshasa, Democratic Republic of the Congo.

3 Institut Supérieur de Techniques Appliquées de Gombe-Matadi, Electricity Department, Democratic Republic of the Congo.

Research Article

World Journal of Advanced Research and Reviews, 2026, 29(02), 1002-1011

Article DOI: 10.30574/wjarr.2026.29.2.0404

DOI url: https://doi.org/10.30574/wjarr.2026.29.2.0404

Received on 09 January 2026; revised on 16 February 2026; accepted on 18 February 2026

This study sizes and analyzes the feasibility of a 6.8 MWp autonomous solar power plant to electrify the Kasongo territory (DRC). For a population of 936,018 inhabitants, the system includes 15,113 PV modules, 153 Li-ion batteries, and 136 inverters. The $11.97M investment achieves a return on investment from the 8th year. RETScreen/PVsyst simulations confirm a daily production of 22,308 kWh and a performance ratio of 49%.

Photovoltaic Solar Energy; Sizing; Kasongo; DRC; Autonomous Power Plant; Economic Feasibility.

https://wjarr.com/sites/default/files/fulltext_pdf/WJARR-2026-0404.pdf

Preview Article PDF

ASSANI SAIDI MZEE, CIMBELA KABONGO Joseph G and TANGENYI OKITO Marcien. Feasibility Study and Sizing of a Photovoltaic Power Plant for Integration into the Kasongo Distribution Grid. World Journal of Advanced Research and Reviews, 2026, 29(2), 1002-1011. Article DOI: https://doi.org/10.30574/wjarr.2026.29.2.0404

Copyright © Author(s). All rights reserved. This article is published under the terms of the Creative Commons Attribution 4.0 International License (CC BY 4.0), which permits use, sharing, adaptation, distribution, and reproduction in any medium or format, as long as appropriate credit is given to the original author(s) and source, a link to the license is provided, and any changes made are indicated.


All statements, opinions, and data contained in this publication are solely those of the individual author(s) and contributor(s). The journal, editors, reviewers, and publisher disclaim any responsibility or liability for the content, including accuracy, completeness, or any consequences arising from its use.

Get Certificates

Get Publication Certificate

Download LoA

Check Corssref DOI details

Issue details

Issue Cover Page

Editorial Board

Table of content

Copyright © 2026 International Journal of Science and Research Archive - All rights reserved

Developed & Designed by VS Infosolution